Czyżyki II, near Hajnówka (Aug 2017)

Czyżyki II installation with the power of 999.9 kWp. The configuration of the system includes:

  • base construction for installation of the modules in four horizontal rows,
  • 3636 photovoltaic modules in polycrystal technology (Sharp) 275 W,
  • 22 solar inverters HUAWEI SUN2000 36 KTL,
  • AC/DC electric installations,
  • transformer station with connection to the power grid.

The whole object takes up the surface of about 1.8 hectares, enclosed and electronically protected. 85 tons of steel with magnelis was used for building the base construction. The modules were installed in the optimal pattern of four horizontal rows.

The construction works were completed by the end of August 2017.